PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing electrical wire above the ceiling at the 4th floor Facing West.jpg Installing the Low Roof insulation Facing West.jpg Installing insulation along the parapet Facing South.jpg Installing the curtain wall mullions around the Monumental Stair radius Facing South.jpg Installing top metal track at the 4th floor Facing East.jpg
Previous page Installing top metal track at the 4th floor Facing East
Installing top metal track at the 4th floor Facing East